•   Home

  •   Team
  •   Project Summary
  •   Meetings
  •   Publications
  •   Deliverables
  •   Software Platform
  •   DISC PhD School
  •   Contact

Deliverables

In this page all deliverables are collected.
D0.1 Web site operational for internal communications (T0+3)
A wiki website (http://disc.akhela.com) has been created for internal communications. It is protected by password. It is used to collect papers that have been published starting from September 2008, the documentation of the project, the deliverables, the Research Unit Activity of each partner, and so on. Moreover it can also been used as a quick communication way between partners.
D1.1 Survey of known results on hierarchical modelling and abstraction (T0+6)
The purpose of this report is to present a tutorial and a survey of formal modelling of concurrent (parallel), hierarchical and distributed discrete-event systems, as a basis for subsequent developments inside DISC.
D6.1 Web site operational for external communications (T0+9)
A website (http://www.disc-project.eu/) has been created for the dissemination of the results. It presents the project partners, the main objectives, the technical approach and the key issues of the project. Moreover it contains all the information concerning the DISC meetings. Finally, it lists according to different topics a series of publications related to the project.
D0.2 Project report for year 1 (T0+12)
D2.1 Initial report for WP2 (T0+12)
This deliverable describes the activity related to Workpackage 2 on "Fault detection and state observer algorithms for embedded systems" during the reporting period from September 1, 2008 till August 31, 2009. The teams involved in Workpage 2 are: UGent, AKH, CWI, INR, TUB, UNICA, UNIZAR.
D3.1 Initial report for WP3 (T0+12)
This deliverable describes the activity related to Workpackage 3 "Coordination control of modular and decentralized systems" during the reporting period from September 1, 2008 till August 31, 2009. The teams involved in Workpage 3 are: CWI, CAS, INR, TUB, UGENT, UNIZAR.
D4.1 Specification of the software platform (T0+12)
This deliverable is a first report on Workpackage 4: "Development of a software platform". The teams involved in Workpage 4 are: AKH, UNICA, CWI, TUB, UNIZAR. During the first year of the project (September 1, 2008 -- August 31, 2009) only the SWP4.1 "Infrastructure" was active and this document describes the software platform specifications.
D6.2 Co-organization of a workshop with North-American researchers (T0+12)
The DISC Workshop on Distributed Discrete Event Systems has been moved to the end of the second year. It has been organized on September 2, 2010 in Berlin, Germany, as a satellite event of the 10th International workshop on Discrete Event Systems WODES 2010 (http://ti3.ee.tu-berlin.de/bigace2/public/index.php?cmd=smarty&id=-1_len).
D6.3 Presentation of papers in conferences and journals (T0+12 - T0+36)
D1.2 Final report for WP1 (T0+15)
The purpose of this report is to present a tutorial and a survey of formal modelling of concurrent (parallel), hierarchical and distributed discrete-event systems, as a basis for subsequent developments inside DISC.. The teams involved in Workpage 1 are: UNIZAR, CAS, CWI, INR, TUB, UNICA.
D0.3 Project report for year 2 (T0+24)
This reports collects all DISC activities and all results obtained by partners divided by WPs during the period September 1, 2009 - August 31, 2010.
D2.2 Progress report for WP2 (T0+24)
This deliverable describes the activity related to Workpackage 2 on "Fault detection and state observer algorithms for embedded systems" during the reporting period from September 1, 2009 till August 31, 2010. The teams involved in Workpage 2 are: UGent, AKH, CWI, INR, TUB, UNICA, UNIZAR.
D3.2 Progress report for WP3 (T0+24)
This deliverable describes the activity related to Workpackage 3 "Coordination control of modular and decentralized systems" during the reporting period from September 1, 2009 till August 31, 2010. The teams involved in Workpage 3 are: CWI, CAS, INR, TUB, UGENT, UNIZAR.
D5.1 Progress report for WP5 (T0+24)
This deliverable describes the activity related to Workpackage 5 "Case studies" during the reporting period from September 1, 2009 till August 31, 2010. The teams involved in Workpage 5 are: TUB, UNICA, UGENT, AKH, VLO, CYB.
D6.4 Organization of a mini-course, special session or tutorial (T0+24)
Several special sessions and tutorial have been organized by DISC partners during the first two years of the project.
D4.2 A preliminary software platform version to be used in WP5 (T0+30)
This deliverable consists in the release of a preliminary version of the software platform to be used for case studies treated in WP5.
D6.5 Call for advanced school for Ph.D. students (T0+32)
This deliverable consists in the first stage of the organization of an advanced school for Ph.D. students, that will take place in Cagliari, Italy, on June 2011.
D2.3 Final report for WP2 (T0+37)
This deliverable presents the report of the consortium on the research of Workpackage 2 on "Fault detection and state observer algorithms for embedded systems" during the reporting period September 1, 2011 till September 30, 2011. The teams involved in WP2 are: UGent, AKH, CWI, INR, TUB, UNICA, UNIZAR.
D3.3 Final report for WP3 (T0+37)
This deliverable presents the report of the DISC Consortium on the research of Workpackage 3 on "Coordination control of modular and decentralized systems". The reporting period is from 1 September 2010 until 30 September 2011. The teams involved in WP3 are: CWI, CAS, INR, TUB, UGENT, UNIZAR.
D0.4 Project report for year 3 (T0+40)
This deliverable is the third year report for Project FP7-ICT-2007.3.7.(c), Grant Agrement n. INFSO-ICT-224498, titled DISC: Distributed Supervisory Control of Large Plants. The project started on 1 September 2008 and was due to end on 31 August 2011. During the last year an extension of 4 months was requested and granted, thus the reporting period of this deliverable is 1 September 2010 – 31 December 2011.
D4.3 Complete and tested version of the software platform, released as an open-source software (T0+40)
This deliverable consists in the release of a completed and tested version of the software platform, as an open-source software.
D4.4 Manual and documentation relative to the software platform (T0+40)
This deliverable consists in the presentation of a manual and a documentation relative to the software platform.
D5.2 Validation of SWP5.1 results (T0+40)
This deliverable validates the results obtained by the partners in the research of Subworkpackage 5.1 on "Distributed road traffic control" during the full duration of the DISC project. The teams involved in SWP5.1 are: UGent, VLO.
D5.3 Validation of SWP5.2 results (T0+40)
This deliverable validates the results obtained by the partners in the research of Subworkpackage 5.2 on "Failure handling for high-throughput screening plants" during the full duration of the DISC project. The teams involved in SWP5.1 are: TUB, CYB.
D5.4 Validation of SWP5.3 results (T0+40)
This deliverable validates the results obtained by the partners in the research of Subworkpackage 5.3 on "Automotive safety monitoring system" during the full duration of the DISC project. The teams involved in SWP5.1 are: UNICA, AKH, UNIZAR.
D6.6 Text book or monograph (T0+40)
This deliverable consists in the preparation of a book that collects several contributions, most of them obtained during the DISC project.




Web: http://www.disc-project.eu



Last Update: December 31, 2011